ForgeNEX

Bathroom renovations: why the budget spirals and how to control it

Replacing a bathtub with a shower tray can cost between 800 and 1,900 euros depending on what the quote includes. Key points to avoid surprises during the work.

4 min read

In this article

The price of changing the shower: two figures that don't always compare the same thing

Bathroom renovation is one of the most common interventions in the Spanish housing stock, and one of the ones that raises the most doubts when requesting a quote. Plumbers with more than 25 years of experience point out that replacing a bathtub with a shower tray has gone from about 800 euros to more than 1,900 if done properly. The figure is striking, but it should be read calmly: it is not always talking about the same job.

The 1,900 euros match Habitissimo's bathroom renovation price guide, which includes replacing the bathtub with a shower tray along with tiling the area, debris removal, the tray and the screen. The same platform, however, maintains ranges of 700 to 900 euros for the basic replacement with a glass screen, and a general range of 900 to 2,300 euros. That is, the difference between paying 800 or 1,900 euros depends to a large extent on which line items are included in the quote and on the materials chosen.

Illustrative detail: Expert plumbers on the situation in Spain: Before, changing the shower cost 800 euros, now it's over 1,900

Why the cost of the work has risen

The increase in price is not an isolated perception of the trade. The National Association of Independent Builders (ANCI) notes that the Ministry of Transport's construction cost index rose more in the 2021-2022 biennium than in the previous fifteen years, and that labor followed a similar trend since 2021. Added to this is greater technical demand in waterproofing and safety, line items that used to be handled more superficially and today should not be overlooked.

For an SME or an IT team managing the renovation of an office, a shop or a premises, this context has a direct reading: construction quotes can no longer be compared only by the total. A low amount can hide line items that later arrive as unforeseen costs, and a high amount can include work you may not need.

What usually gets left out of the initial quote

The starting price is rarely the final price. Initial quotes often leave out unforeseen items such as new pipes or drains, or debris removal. For a full renovation, Habitissimo's guide calculates about 3,500 euros for a bathroom of about 5.4 square meters. In professional environments, where schedules, access and protection of common areas must also be coordinated, that contingency margin should be budgeted from the start.

  • Materials: a ceramic tray does not cost the same as a high-end resin one.
  • Screens: standard sliding screens lower the bill compared with custom solutions.
  • Scope of tiling: limiting it to the shower area reduces square meters and labor.
  • Existing elements: keeping what is in good condition avoids replacing for the sake of replacing.

Public aid: a little-explored route

When the work improves accessibility, there are public programs that can reduce the expense. In Bilbao, the Helduak-Mayores Renove Vivienda program of the municipal company Surbisa covers in its 2026 edition up to 50% of the eligible budget for people over 70 and people with reduced mobility or sensory disability. It is an example of how a well-planned renovation can ease the bill, although it requires finding out before contracting and adjusting the project to the call's rules.

What we recommend at ForgeNEX

In space adaptation projects for SMEs, documentary discipline makes the difference. Our recommendation is to treat the renovation like any other technical project:

  1. Request quotes broken down by line items, not a closed total. That way you can compare what each one includes.
  2. Demand the scope in writing: debris removal, waste management, protections and working hours.
  3. Set aside a buffer for unforeseen pipe or drain issues, especially in old buildings.
  4. Document the prior state with photos and records, just as you would with a systems inventory.
  5. Review aid and municipal regulations before signing, especially if the work affects accessibility.

In the end, the comparison between 800 and 1,900 euros is not so much an inexplicable increase as a wake-up call about the fine print. As in any technology project, the real cost is not in the initial figure, but in what is left out of it. If you want to bring order to this type of decision in your company, at ForgeNEX we can help you approach the process with good judgment.

Source: Genbeta. Analysis and adaptation: ForgeNEX.

Keep reading

Call us WhatsApp